Displaying 10 out of 26 suppliers
Spare Parts
View more
View more
Inert Gas System Spare Parts Suppliers
The marine inert gas system on a tanker is everything between the IGG generator outlet and the cargo tank atmosphere - the deck distribution main carrying conditioned inert gas across the ship, the deck water seal that prevents cargo vapours backflowing into the engine room, the P/V breaker that protects the tank structure from over- and under-pressure, the mast riser that vents excess gas to atmosphere, the isolating valves that segregate cargo tanks from each other and from the IG main, and the control instrumentation that watches O2 content, pressure, and flow across the system. SOLAS Chapter II-2 Regulation 4 mandates the inert gas system on oil tankers over 8000 DWT and on chemical tankers carrying flammable cargoes; the system is what stands between cargo operations and a hydrocarbon explosion in a vapour-loaded tank.
Spare-part procurement on this scope covers the components downstream of the generator - water seal renewal kits when the deck seal water level alarms drift out of tolerance, P/V breaker disc valves when the cracking pressure shifts off setpoint, isolating valve internals when the cargo-tank segregation valve fails the periodical pressure test, mast riser flame screens when the corrosion-resistant alloy reaches end of service, and the instrumentation renewals that keep the O2, pressure, and flow signals reporting reliably to the operator. The right partner ships brand-authorised components with documented traceability matched to the installed system design; the wrong one ships generic replacements that fail the witnessed function test at the next class survey.
Component Scope - What Falls Under IGS Spare Parts
Across an inert gas system installation downstream of the generator, the spare-part inventory covers a defined component range:
- Deck water seal components - the seal vessel, water-level instrumentation, drain and overflow arrangement, gas inlet and outlet flanges, and the high-temperature internal liner that handles the gas conditioning before tank delivery.
- P/V breaker components - pressure and vacuum disc valves, liquid charge (oil or glycol) for the breaker bowl, calibration weights, and the spring-loaded or weighted closure mechanism that protects the tank ullage.
- Mast riser components - flame screens, riser pipe sections, scupper drains, and the rain protection cap that completes the venting arrangement to atmosphere.
- Isolating valves and segregation arrangement - butterfly valves, gate valves on the IG main, deck isolation valves at each cargo tank, plus the actuators and position feedback that ties valve state to the control system.
- Distribution piping spares - flanges, gaskets, expansion bellows, pipe sections, and the corrosion-resistant alloy fittings that handle the wet acidic gas environment downstream of the scrubber.
- Instrumentation and control spares - O2 analyzers and sensor cells, pressure transducers, flow meters, temperature sensors, alarm contacts, and the panel components that integrate IGS data into the central alarm monitoring system.
Combustion chamber, scrubber tower, demister, and burner components sit upstream on the generator itself, where inert gas generator spare parts hold the renewal scope on the IGG side of the installation.
Deck Water Seal and P/V Breaker - Critical Safety Components
Two components on the inert gas system carry disproportionate safety weight relative to their procurement value. Deck water seal - the wet seal vessel that prevents cargo vapours backflowing from cargo tanks into the engine room IG main during low-pressure events. Water level inside the seal has to stay within design band for the seal to work; a low-level alarm condition means the seal could let hydrocarbon vapours through to ignition sources in the engine room. Seal water composition matters - some installations use plain seawater (with the corrosion implications), others use treated water or glycol mixtures depending on the OEM specification. P/V breaker - the secondary protection against tank over- and under-pressure events, sitting in parallel with the primary P/V valves. The breaker disc valves crack at a defined setpoint (typically 1400 to 2100 mmWG positive, 700 mmWG negative), with the liquid charge in the bowl providing the seal until the differential pressure exceeds threshold. Charge level and weight matter for the cracking pressure to stay on setpoint. Both components carry annual inspection requirements under SOLAS Chapter II-2 Regulation 4, and the surveyor reviews the maintenance log and the spare-part history at the periodical Safety Equipment Certificate survey.
Brand-Authorised Channels
The inert gas system OEM landscape concentrates around a defined population matched to the broader IG installation:
- ALFA LAVAL Smit - dominant OEM globally for complete IG systems including the deck water seal, P/V breaker, and mast riser arrangement; spare parts available through the Smit service network.
- HAMWORTHY (Wartsila) - Hamworthy Moss IG systems on installed older tanker fleet; Wartsila service network supports forward years.
- Kashiwa Tech Co - Japanese IG systems with proprietary deck water seal and distribution arrangement.
- Green Instruments - O2 analyzer specialists with dominant share of IG instrumentation across multiple OEMs.
- Survitec, Ocean Clean - independent spare parts specialists with documented authorisation across Smit and Hamworthy installed base.
- Atlas Copco, Feen Marine, Fuji Electric, GasTech Engineering - regional and specialist channels covering specific OEM scope.
Brand-authorised channels matter where the OEM type approval requires traceable components for the class surveyor to accept the system at periodical survey.
SOLAS Chapter II-2 Compliance and Class Approval
Inert gas system spare parts carry the type-approval and traceability documentation that the periodical Safety Equipment Certificate survey relies on. SOLAS Chapter II-2 Regulation 4 mandates the system on tankers and sets the operational requirements; IMO MSC.1/Circ.1466 carries the revised guidelines covering performance criteria, design requirements, and survey procedures. IACS member societies - DNV, ABS, Lloyd's Register, Bureau Veritas, ClassNK, RINA, KR, CCS - issue type approval certificates covering the broader survey acceptance framework, with non-IACS bodies (HRS, INSB Class, RMRS) covering specific flag administrations. Each pressure-rated component carries batch traceability, water seal level instrumentation ships with calibration certificate, O2 analyzer cells ship with the calibration data sheet matching the installed instrument model, and isolation valves carry the dimensional inspection report matching the original design drawing. Need maintenance, function testing, or the witnessed annual inspection that pair with parts renewal? Inert gas system service providers handle that work.
Selecting an Inert Gas System Spare Parts Supplier
When you shortlist suppliers for this scope, weigh the structural evidence on each profile rather than the marketing surface:
- Brand authorisation matched to installed OEM - Alfa Laval Smit, Hamworthy/Wartsila, Kashiwa, Green Instruments authorised channels for the specific water seal, P/V breaker, instrumentation, and distribution arrangement on the vessel.
- Water seal and P/V breaker technical depth - the supplier ships the right water level instrumentation, the correct liquid charge for the breaker bowl, and the calibration weights that hold cracking pressure on setpoint at the witnessed test.
- O2 analyzer and instrumentation traceability - sensor cells shipped with calibration certificate and maximum remaining shelf life; pressure and flow transducers matched to the installed control panel architecture.
- IACS documentation depth - type approval certificates matched to vessel class registry, dimensional inspection reports on valves, pressure-test certificates on piping spares - documentation that holds at docking survey.
- Regional warehouse coverage - deck water seal components, P/V breaker discs, O2 sensor cells, mast riser flame screens in stock in Singapore, Rotterdam, Dubai, Houston, Piraeus, Shanghai, Mumbai, or wherever the fleet trades. Same-week delivery under cargo operation pressure.
Suppliers worth shortlisting on this scope deliver brand authorisation matched to the installed OEM, water seal and P/V breaker technical depth, O2 analyzer traceability, IACS documentation depth, and regional warehouse coverage matched to the trading pattern. For control system and instrumentation work - O2 analyzer calibration, alarm and shutdown function test, PLC programming - see IGS electrical and automation specialists.

Year Founded: 2018
VerifiedCATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
ARPA (Automatic Radar Plotting Aids)
(195)
BRAND:
Kashiwa Tech Co
Green Instruments
ALFA LAVAL
Survitec
Ocean Clean
(15)
CLASS APPROVED:
IACS: ABS, ClassNK, CCS, BV
WAREHOUSES:
China

Year Founded: 2011
VerifiedCATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
ARPA (Automatic Radar Plotting Aids)
(177)
BRAND:
Kashiwa Tech Co
Green Instruments
ALFA LAVAL
Survitec
Ocean Clean
(15)
CLASS APPROVED:
IACS: DNV
WAREHOUSES:
Singapore
United Arab Emirates
Angola
Austria
Australia (209)

Year Founded: 2004
VerifiedCATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
ARPA (Automatic Radar Plotting Aids)
AUS (Automatic Unloading Systems)
Accommodation Ladder Davits
Accomodation Ladders & Gangways
Air Compressors
Air Driven Motors
Air Horns
Air Reservoirs
Air Starters
Alpha Lubrication Systems
Anemometers
(162)
CLASS APPROVED:
IACS: ClassNK, BV

Year Founded: 2025
VerifiedCATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
ARPA (Automatic Radar Plotting Aids)
AUS (Automatic Unloading Systems)
Accommodation Ladder Davits
Accomodation Ladders & Gangways
Air Compressors
Air Driven Motors
Air Horns
Air Reservoirs
Air Starters
Alpha Lubrication Systems
Anemometers
(166)
WAREHOUSES:
Hong Kong

Year Founded: 2010
RM verifiedCATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
Accommodation Ladder Davits
Accomodation Ladders & Gangways
Air Compressors
Air Driven Motors
Air Horns
Air Reservoirs
Air Starters
AIS (Automatic Identification Systems)
Alpha Lubrication Systems
AMS (Alarm Monitoring Systems)
Anemometers
Anti-Heeling Systems
ARPA (Automatic Radar Plotting Aids)
(166)
CLASS APPROVED:
IACS: ABS, RINA, ClassNK, CCS, BV, CRS, PRS, KR, LR, DNV, IRS
Non-IACS: RMRS, HRS, Other
CATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
Accomodation Ladders & Gangways
Air Compressors
Air Driven Motors
Automation Control Equipment & Control Units
BWTS (Ballast Water Treatment Systems)
BNWAS (Bridge Navigational Watch Alarm Systems)
Boat Engines
Boiler Automation Equipment
Centrifugal Pumps
Communication Equipment
Compass (Gyro & Magnetic)
(91)
WAREHOUSES:
Turkey

Year Founded: 2014
CATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
ARPA (Automatic Radar Plotting Aids)
AUS (Automatic Unloading Systems)
Accommodation Ladder Davits
Accomodation Ladders & Gangways
Air Compressors
Air Driven Motors
Air Horns
Air Reservoirs
Air Starters
Alpha Lubrication Systems
Anemometers
(168)
WAREHOUSES:
Egypt

Year Founded: 1998
CATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
ARPA (Automatic Radar Plotting Aids)
AUS (Automatic Unloading Systems)
Accommodation Ladder Davits
Accomodation Ladders & Gangways
Air Compressors
Air Driven Motors
(161)
CLASS APPROVED:
IACS: ABS, ClassNK, BV, LR, DNV, IRS
WAREHOUSES:
Bangladesh

Year Founded: 2013
CATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
ARPA (Automatic Radar Plotting Aids)
AUS (Automatic Unloading Systems)
Accommodation Ladder Davits
Accomodation Ladders & Gangways
Air Compressors
Air Driven Motors
(172)
CLASS APPROVED:
IACS: DNV
WAREHOUSES:
South Korea

Year Founded: 2024
CATEGORIES:
Inert Gas Systems
15 PPM Monitoring Equipment
AIS (Automatic Identification Systems)
AMS (Alarm Monitoring Systems)
ARPA (Automatic Radar Plotting Aids)
AUS (Automatic Unloading Systems)
Accommodation Ladder Davits
Accomodation Ladders & Gangways
Air Compressors
Air Driven Motors
(171)
CLASS APPROVED:
IACS: RINA, ClassNK, CCS, BV, CRS, TL, KR, LR, DNV
Non-IACS: HRS, Other
WAREHOUSES:
Bangladesh
