Displaying 10 out of 10 service providers
Technical Services
View more
View more
Inert Gas System Services Providers
Marine inert gas system service is the recurring and overhaul work that keeps the IG distribution and control infrastructure operational on a tanker downstream of the IGG generator - the annual class-witnessed function test that confirms the deck water seal holds, the P/V breaker setpoint stays on cracking pressure, and the isolation valves segregate properly; the periodic flushing of the deck water seal when sediment accumulates from seawater service; the pressure-test of the IG main piping at the periodical survey; the calibration of pressure and flow instrumentation that feeds the operator control panel; and the drydock overhaul work that resets the whole distribution arrangement to baseline performance. An IG system that fails the annual survey is an IG system that takes the tanker out of cargo service until the surveyor re-witnesses the repaired installation.
Service providers covering this scope handle the work that no spare-part supplier can ship - on-board commissioning of a refurbished water seal, P/V breaker valve overhaul with witnessed setpoint verification, mast riser flame screen inspection at height, distribution piping ultrasonic thickness measurement, deck water seal liquid replacement and level instrumentation calibration, and the troubleshooting work when the IG main pressure drops or the O2 reading spikes during cargo operations. The right service company arrives with trained technicians, class-recognised methodology, and the documentation that holds at periodical survey witnessing.
What IGS Service Covers Onboard
The work scope across an inert gas system breaks into a defined set of recurring and as-needed interventions:
- Deck water seal service - water level verification and instrumentation calibration, seal liquid replacement when contamination develops, internal liner inspection at scheduled intervals, drain and overflow check, and the witnessed function test confirming back-flow protection at the periodical survey.
- P/V breaker overhaul - disc valve removal and bench inspection, cracking-pressure verification against the design setpoint, liquid charge replacement in the breaker bowl, weight or spring calibration, and the witnessed function test at maximum tank pressure simulation.
- Mast riser inspection - flame screen condition check, riser pipe internal inspection, scupper drain clearance verification, and the rain cap arrangement that prevents water ingress to the venting line.
- Isolating valve function test - actuator function on automated valves, position feedback verification against the control panel display, tightness test on cargo tank isolation valves, and the segregation integrity check at the cargo deck arrangement.
- Distribution piping pressure test - hydrostatic or pneumatic pressure test of the IG main at the design pressure, ultrasonic thickness measurement on accessible sections, and the witnessed pressure-decay test that confirms system integrity.
- System commissioning after retrofit or refit - full system function verification after equipment changes, witnessed acceptance test against the design specification, and the documentation update that the operator's planned maintenance system needs.
SOLAS Annual Survey and Surveyor-Witnessed Scope
Inert gas system services sit within the Safety Equipment Certificate scope under SOLAS Chapter I/14, with the periodical survey requirements under SOLAS Chapter II-2 Regulation 4. The class surveyor witnesses the annual IG system function test - O2 content at the cargo tank inlet under cargo loading simulation, deck water seal function under low-pressure event, P/V breaker setpoint and function under over-pressure simulation, isolation valve segregation, mast riser flame screen condition, and the alarm and shutdown function across the critical interlocks. IACS member societies - DNV, ABS, Lloyd's Register, Bureau Veritas, ClassNK, RINA, KR, CCS - witness the test and sign off the certificate scope, with non-IACS bodies (HRS, INSB Class, RMRS) covering specific flag administrations. The service provider produces the witnessed test report, the calibration records on pressure switches and relief valves, the maintenance log covering equipment changes during the survey period, and the OEM authorisation chain. Need water seal seals, P/V breaker discs, isolating valve internals, or mast riser flame screens identified during service? Inert gas system spare parts suppliers cover the renewals that pair with the maintenance window.
Brand Specialist Service
Brand specialists matched to the installed IG system OEMs dominate the marine service provider population:
- ALFA LAVAL Smit service network - authorised commissioning, overhaul, and annual test scope on Smit IG system installations worldwide.
- HAMWORTHY (Wartsila) service - factory-authorised service on Hamworthy Moss installed base, with Wartsila global service network supporting older units across forward years.
- Kashiwa Tech Co service - OEM-authorised service on Japanese-built IG systems.
- Survitec, Ocean Clean - independent IGS service specialists with strong brand recognition on Smit and Hamworthy installed base.
- Green Instruments - O2 analyzer calibration and instrumentation service specialists across multiple IG system OEMs.
- BEYMAR, OCEANSERVICE, NEW CHANNEL, MYTHMAR, GM WORLDINC, Arctic Ship Repair - regional service companies covering specific OEM authorisation and territorial markets.
Brand-authorised service matters where the OEM type approval requires authorised personnel and certified methodology for the witnessed test report to hold at class survey.
In-Situ vs Drydock Work Scope
Marine IGS service splits across two operational windows. Afloat scope - water seal level verification, P/V breaker function test, isolation valve function, instrumentation calibration, leak diagnosis on the IG main, and the annual class-witnessed function test that typically happens at port between cargo operations. Drydock scope - complete water seal overhaul with internal liner replacement, P/V breaker complete strip and rebuild, IG main piping ultrasonic measurement and section replacement where wall thickness has degraded, isolation valve removal and bench overhaul, and the full pressure-test of the rebuilt distribution main before re-entry to service. The service provider that covers both windows - afloat function testing and drydock intervention - lets the operator plan work against actual condition rather than the conservative class interval.
Selecting a Marine IGS Service Provider
When you shortlist service companies, weigh the structural evidence on each profile rather than the marketing surface:
- Class society recognition matched to vessel registry - IACS member acceptance (DNV, ABS, Lloyd's Register, Bureau Veritas, ClassNK, RINA, KR, CCS) for witnessed function testing; non-IACS bodies for specific flag administrations.
- OEM brand authorisation - Alfa Laval Smit, Hamworthy/Wartsila, Kashiwa authorised channels for the specific IG system installed on the vessel.
- Water seal and P/V breaker overhaul capability - in-house workshop or established partner arrangements for breaker rebuild, calibration verification, and the witnessed setpoint test that the class surveyor accepts.
- Pressure-test equipment and methodology - hydrostatic and pneumatic test pumps, calibrated pressure gauges, leak detection equipment, and the procedural documentation that holds at survey witnessing.
- Riding team mobilisation - trained technicians mobilised to the vessel's port or anchorage when the IG system fails during cargo operations or before a scheduled cargo load.
- Regional service network matched to fleet itinerary - authorised personnel in the ports and drydock yards the fleet uses, with rapid response under cargo operation pressure.
Service companies worth shortlisting on this scope deliver class society recognition matched to vessel registry, OEM brand authorisation matched to the installed system, water seal and P/V breaker overhaul capability, pressure-test methodology, and riding team mobilisation under operational pressure. Need control panel programming, O2 analyzer calibration, alarm and shutdown logic configuration, or broader instrumentation work? IGS electrical and automation specialists list handle that side of the system.

Year Founded: 2019
RM verifiedCATEGORIES:
Inert Gas Systems
Air Compressors
Alpha Lubrication Systems
Bearings
Boiler Inspection & Evaluation
Boiler Retubing
CPP Systems (Controllable Pitch Propeller)
Electric Propulsion Systems
Engine Fuel Equipment
Engines (2-Stroke)
(34)
BRAND SPECIALIST:
HAMWORTHY
ALFA LAVAL
Kashiwa Tech Co
Green Instruments
Survitec
(15)
SERVICE AREA:
Tunisia
Turkey

Year Founded: 2019
RM verifiedCATEGORIES:
Inert Gas Systems
Accommodation & Interior
Air Compressors
Alpha Lubrication Systems
Bearings
Boiler Inspection & Evaluation
Boiler Retubing
Cleaning Systems
CO2 Systems
Control Air Dryers
CPP Systems (Controllable Pitch Propeller)
Crankshaft & Camshaft Services
Distance Rings & Spacer Rings for Stern Tube
Electric Propulsion Systems
Engine Fuel Equipment
(53)
SERVICE AREA:
Turkey

Year Founded: 2013
RM verifiedCATEGORIES:
Inert Gas Systems
Hatch Covers
Horns
Hydraulic Cranes
Hydraulic Systems & Equipment
(6)
BRAND SPECIALIST:
ALFA LAVAL
SERVICE AREA:
China
Malaysia
Singapore
CLASS APPROVED:
IACS: ABS

Year Founded: 2010
RM verifiedCATEGORIES:
Inert Gas Systems
Accommodation & Interior
Air Compressors
Alpha Lubrication Systems
Bearings
Boiler Inspection & Evaluation
Boiler Retubing
Cleaning Systems
CO2 Systems
Control Air Dryers
(62)
SERVICE AREA:
China
SERVED PORTS:
Suizhang Gang
Dalian
Lushun
Guangzhou
Longkou Gang (287)

Year Founded: 2018
RM verifiedCATEGORIES:
Inert Gas Systems
Accommodation & Interior
Air Compressors
Alpha Lubrication Systems
Bearings
Boiler Inspection & Evaluation
Boiler Retubing
CPP Systems (Controllable Pitch Propeller)
CO2 Systems
Cleaning Systems
Control Air Dryers
Crankshaft & Camshaft Services
Distance Rings & Spacer Rings for Stern Tube
Electric Propulsion Systems
Engine Fuel Equipment
(55)
SERVICE AREA:
Turkey
CATEGORIES:
Inert Gas Systems
Accommodation & Interior
Air Compressors
Bearings
Boiler Inspection & Evaluation
Boiler Retubing
CO2 Systems
Cleaning Systems
Crankshaft & Camshaft Services
Distance Rings & Spacer Rings for Stern Tube
(38)
SERVICE AREA:
Turkey
SERVED PORTS:
Delta Terminal
Aksaz Limani
Borusan Fertilizer Jetty
Antalya Offshore Terminal
Antalya (67)

Year Founded: 2014
CATEGORIES:
Inert Gas Systems
Accommodation & Interior
Air Compressors
Bearings
Boiler Inspection & Evaluation
Boiler Retubing
Cleaning Systems
Crankshaft & Camshaft Services
Distance Rings & Spacer Rings for Stern Tube
Engines (2-Stroke)
(35)
SERVICE AREA:
Egypt
SERVED PORTS:
Zafarana Terminal
Zeit Bay Lpg Terminal
El Ghardaqa
Ras Gharib
Ras Shukhier (39)

Year Founded: 2024
CATEGORIES:
Inert Gas Systems
Air Compressors
Alpha Lubrication Systems
Boiler Inspection & Evaluation
CO2 Systems
(64)
SERVICE AREA:
Bangladesh
SERVED PORTS:
Chittagong
Mongla
CLASS APPROVED:
IACS: ABS, RINA, ClassNK, CCS, BV, CRS, KR, LR, DNV, IRS
Non-IACS: RMRS, Other
CATEGORIES:
Inert Gas Systems
Accommodation & Interior
Air Compressors
Alpha Lubrication Systems
Bearings
(66)
SERVICE AREA:
Bangladesh
India
Pakistan
Turkey
South Africa
SERVED PORTS:
Chittagong
Mongla
Chalna
Dhaka
Bedi (181)
CLASS APPROVED:
IACS: ABS, RINA, ClassNK, BV, LR, DNV
Year Founded: 2025
CATEGORIES:
Inert Gas Systems
Air Compressors
Alpha Lubrication Systems
Bearings
Boiler Inspection & Evaluation
Boiler Retubing
Cleaning Systems
CO2 Systems
Control Air Dryers
CPP Systems (Controllable Pitch Propeller)
(61)
SERVICE AREA:
China
Egypt
India
Panama
Russia (2)
CLASS APPROVED:
IACS: CCS

