For BuyersFor Vendors

Displaying 1-10 out of 25 shipyards

Shipbuilding

AHTS Vessels

(9)

Barge

(28)

RO-RO Vessels

View more

Length (m)60-490 m
60
490
Width (m)16-110 m
16
110
Depth (m)6-14 m
6
14
Wharf Length (m)126-5818 m
126
5818

RO-RO Vessel Shipbuilders

Ro-Ro vessels move cargo that rolls on and rolls off under its own power - new cars from factory to overseas market on Pure Car Carrier (PCC) and Pure Car and Truck Carrier (PCTC) tonnage, freight trailers and self-propelled cargo on cargo Ro-Ro ships, mixed vehicle and passenger loads on Ro-Pax ferries running Baltic and Mediterranean short-sea routes, and combined container-plus-trailer loads on ConRo vessels working the trans-Atlantic North America to Northern Europe trades. The Ro-Ro category covers a wider range of vessel types than most cargo segments, and shipbuilders working the space have to handle vehicle deck arrangement, ramp geometry, ventilation for engine exhaust, fire safety on high-risk Ro-Ro spaces under SOLAS Chapter II-2, and the damage stability calculations that post-Estonia 1994 SOLAS reforms tightened significantly.

Building a Ro-Ro vessel is a shipyard project that runs 12 to 24 months from steel cutting to delivery, depending on vessel size and complexity, with the shipyard managing design integration between multiple OEMs across propulsion, cargo handling, safety systems, and accommodation on Ro-Pax builds. Shipowners contracting for Ro-Ro newbuild work weigh dock capacity, wharf length for outfitting, gantry crane capability, previous Ro-Ro build experience, class society approvals, and the track record on similar cargo profiles across the shipyard's recent delivery history.

Ro-Ro Vessel Types by Cargo Profile

The Ro-Ro category splits across distinct vessel types that shipbuilders serve with different design approaches:

  • Pure Car Carrier (PCC) - vehicle-only cargo on multiple fixed decks, high air draft, no passengers, dedicated to new-vehicle export trades. Typical capacity 4000 to 6500 CEU (Car Equivalent Units).
  • Pure Car and Truck Carrier (PCTC) - similar to PCC but with hoistable decks that reconfigure for taller cargo - construction vehicles, trucks, high-and-heavy machinery. Capacity 6000 to 8500 CEU with flexible deck arrangement.
  • Ro-Pax ferry - combined passenger and vehicle carriage on short-sea routes, with accommodation for 500 to 3000 passengers plus car and truck deck space. Common on Baltic, Mediterranean, English Channel, Japanese domestic, and other short-sea routes.
  • Cargo Ro-Ro - drive-through cargo ship with no passenger accommodation, moving trailers and self-propelled cargo through bow-to-stern or stern-only ramp arrangements. Dominant on Grimaldi and ACL trans-Atlantic services.
  • ConRo (Container + Ro-Ro) - hybrid designs with container cells above deck and Ro-Ro capacity below, common on North Atlantic and specific niche routes.
  • Trailer ships - smaller vessels dedicated to unaccompanied trailer transport on short-sea routes.

Design and Engineering Considerations

Ro-Ro shipbuilding carries design complications that other cargo tonnage doesn't face. Vehicle deck layout drives the whole vessel arrangement - the shipbuilder has to design cargo decks with sufficient clearance for the tallest expected vehicle (typically 4.5m to 5.5m for high-and-heavy on PCTC), the deck loading capacity to handle heavy trucks (typical rating 15 tonnes per axle on cargo Ro-Ro), and the vehicle securing system with lashing points positioned for standard truck and trailer geometry. Ramp arrangements matter enormously - stern ramps handle the bulk of cargo operations, quarter ramps allow simultaneous loading and discharge on some designs, side ramps and bow visor arrangements appear on specific Ro-Pax and Ro-Ro designs. Ventilation systems have to handle CO and NOx exhaust from vehicles driving on and off during cargo operations - typical air change rate on Ro-Ro spaces is 20 changes per hour during cargo work, dropping to 6 changes per hour during transit. Fire safety on Ro-Ro spaces is one of the highest-risk categories in commercial shipping, with SOLAS Chapter II-2 requirements including fixed CO2 or water-mist systems, fire detection zoning, and structural fire protection between accommodation and cargo spaces.

SOLAS Chapter II-1 and Stability Requirements

Damage stability requirements on Ro-Ro passenger tonnage tightened significantly after the Herald of Free Enterprise (1987) and Estonia (1994) casualties - both incidents involved catastrophic loss of transverse stability after water ingress through open or damaged bow doors. SOLAS Chapter II-1 subsequently mandated tighter subdivision requirements, damage stability calculations covering asymmetric flooding on Ro-Ro spaces, and the "Stockholm Agreement" additional requirements for Northwest European Ro-Ro passenger routes. Class society Ro-Ro specific rules from IACS members - DNV, ABS, Lloyd's Register, Bureau Veritas, ClassNK, RINA, KR, CCS - cover the shipbuilder's design review at contract stage, plan approval during construction, and the witnessed testing at sea trials. Non-IACS bodies (HRS, INSB Class, RMRS) cover specific flag administrations. Delivery to shipowner requires class certification, IMO Ship Safety Certificate, and the flag administration approval before the vessel can enter commercial service.

Global Ro-Ro Shipbuilder Landscape

A defined shipbuilder population handles Ro-Ro newbuild construction globally:

  • Hyundai Heavy Industries (HHI) (Korea) - largest Ro-Ro/PCTC builder globally by delivered tonnage, with the Ulsan yard handling large PCTC newbuild for Wallenius Wilhelmsen, Höegh, K Line, NYK.
  • Hyundai Mipo Dockyard (Korea) - PCTC specialist, mid-size and large Ro-Ro scope.
  • Daewoo Shipbuilding & Marine Engineering (DSME) (Korea) - PCTC and Ro-Pax scope on Geoje island.
  • Samsung Heavy Industries (Korea) - specialty Ro-Ro tonnage.
  • China Shipbuilding State Corporation (CSSC) - dominant Chinese Ro-Ro builder covering PCTC newbuild for domestic and export scope.
  • Guangzhou Shipyard International (GSI) - Chinese newbuild.
  • Fincantieri (Italy) - Ro-Pax and cruise ferry scope on European shipyards.
  • Meyer Werft (Germany) - Ro-Pax construction on the Papenburg yard.
  • Kawasaki Heavy Industries (Japan) - Japanese-flag Ro-Ro construction.
  • Ulsan Nam Ho (Korea) - Ro-Ro specialist covering mid-size cargo scope.
  • Damen Shipyards (Netherlands) - smaller Ro-Ro and workboat scope.
  • PETROVIETNAM Shipbuilding (Vietnam) - regional newbuild capability with 380m graving dock supporting large-vessel construction.

Ro-Pax construction concentrates around European specialists (Fincantieri, Meyer Werft, historically STX Finland) where passenger accommodation and safety expertise matters most. PCTC construction concentrates around Korean and Chinese yards where volume production and delivery cost drive the market. Cargo Ro-Ro sits in between - Korean, Chinese, and European yards all handle the mid-size cargo scope depending on contract terms and delivery timing.

Newbuild Procurement Process

Contracting a Ro-Ro newbuild follows a defined project workflow. Design specification comes first - the shipowner defines cargo profile (car-only, PCTC, cargo Ro-Ro, Ro-Pax), route pattern (short-sea vs deep-sea), expected loading rate at typical ports, class society requirements matched to flag administration, and the delivery target date. Shipyard selection weighs dock capacity against vessel dimensions (typical PCTC 200-230m LOA needs 220m+ dock), wharf length for outfitting, gantry crane capacity for engine and superstructure lifts, and the yard's Ro-Ro delivery track record. Contract negotiation covers price, payment schedule (typically 20-30% deposit, milestone payments through construction, balance at delivery), delivery date and liquidated damages, warranty scope, and post-delivery service arrangements. Design approval runs through the class society plan review; construction spans 12-24 months with regular class surveyor visits; sea trials verify contract performance before delivery to the shipowner. Once in service, the vessel's operational life includes drydock cycles that ship repair yards handle across the trading pattern.

Selecting a Ro-Ro Shipbuilder

When shortlisting shipyards for a Ro-Ro newbuild contract, weigh the structural evidence on each profile that separates real specialists from general shipbuilders:

  • Ro-Ro delivery track record - documented Ro-Ro/PCTC/Ro-Pax delivery history over the past 5-10 years, matched to the cargo profile of the intended newbuild.
  • Dock capacity matched to vessel dimensions - dock length, width, and depth accommodating the intended LOA and beam plus outfitting margin; wharf length for post-launch outfitting work.
  • Class society approvals matched to flag - IACS member type approval on similar vessels (DNV, ABS, Lloyd's Register, Bureau Veritas, ClassNK, RINA, KR, CCS) documenting the shipyard's design and construction capability for Ro-Ro tonnage.
  • Design and engineering capability - in-house naval architecture team or established partnership with Ro-Ro specialist design firms handling vehicle deck arrangement, ramp geometry, ventilation, fire safety, and damage stability.
  • Delivery schedule and financial stability - realistic delivery date matched to the yard's current orderbook, plus financial standing documented through recent audits and refund guarantees from established lending institutions.
  • Post-delivery warranty and service network - warranty coverage for 12-24 months post-delivery, plus the OEM service network supporting the propulsion, cargo handling, and safety systems installed on the vessel.

For end-of-life Ro-Ro vessels, the disposal route runs through shipbreaking and recycling yards that handle certified vessel dismantling under the Hong Kong International Convention framework.

  • PETROVIETNAM SHIPBUILDING AND MECHANICAL COMPANY LIMITED
    PETROVIETNAM SHIPBUILDING AND MECHANICAL COMPANY LIMITED logo

    Viet Nam

    RM verified

    501-1000

    PVSMs repair dock area is invested on a large scale with dimensions of 380m in length, 86m in width , and 14m in depth . With modern facilities including 350T/150T gantry crane, high-pressure water blaster, sandblaster. In addition, PVSM also has nearly 100.000 m2 assembly area, large workshops specializing in processing and manufacturing many components to serve the shipbuilding, conversion, and repairing ship

    pvsm.vn
    sale@pvsm.vn

    SHIPBUILDING:

    • RO-RO Vessels

    • AHTS Vessels

    • Barge

    • Bulk Carriers

    • Cable Layer Vessels

    • Construction Vessels

    • Container Vessels

    • Cruise Vessels

    • Diving Support Vessels

    • Dredger Vessels

      (+16)

    TOTAL DOCKS • 1

    1

    Graving Dock

    380

    86

    14

    m

    TOTAL WHARF LENGTH • 380 m

    1

    Wharf 1

    380 M

  • Alexandria Shipyard logo

    Egypt

    Alexandria Shipyard Co. is an Egyptian yard at Kabbary in the port of Alexandria, working around the clock. Its work divides into five areas: naval and defence construction, commer

    SHIPBUILDING:

    • RO-RO Vessels

    • Barge

    • General Cargo Vessels

    • Tugboats

    TOTAL DOCKS • 3

    1

    Slipway

    180

    28

    7.5

    m

    2

    Slipway

    150

    24

    6.5

    m

    3

    Syncrolift

    60

    16

    5.5

    m

    TOTAL WHARF LENGTH • 700 m

  • Thailand

    Asian Marine Services Public Company Limited, a listed Thai company, runs the Asimar Shipyard at Laem Fa Pha in Phra Samut Chedi, Samut Prakan. The company started in 1981 as a mar

    SHIPBUILDING:

    • RO-RO Vessels

    • Barge

    • Oil Tanker

    • Container Vessels

    • General Cargo Vessels

    • Ferries

    • Rigs & Platforms

    • Tugboats

    • AHTS Vessels

    • PSV Vessels

      (+2)

    TOTAL WHARF LENGTH • 126 m

    1

    Wharf 1

    126 M

  • Baku Shipyard logo

    Azerbaijan

    Baku Shipyard LLC builds, repairs and converts ships on the Caspian shore at Baku, Azerbaijan. The foundation stone was laid on 19 March 2010, the joint venture was founded on 10 M

    SHIPBUILDING:

    • RO-RO Vessels

    • Crude Oil Tankers

    • Chemical Tankers

    • Ferries

    • Rigs & Platforms

    • Tugboats

    • Construction Vessels

    TOTAL DOCKS • 1

    1

    Floating Dock

    168.4

    40

    7

    m

    TOTAL WHARF LENGTH • 1100 m

    1

    Wharf 1

    1100 M

  • United Kingdom

    Cammell Laird Shiprepairers & Shipbuilders Limited works on the River Mersey at Birkenhead, on Merseyside. Shipbuilding and ship repair have been carried on at the site for more th

    SHIPBUILDING:

    • RO-RO Vessels

    • Research Vessels

    TOTAL DOCKS • 1

    1

    Graving Dock

    150

    40

    12

    m

    TOTAL WHARF LENGTH • 550 m

    1

    Wharf 1

    350 M

    2

    Wharf 2

    200 M

  • China

    CMI Qingdao Shipyard builds ships at the Nvdao heavy industry base in the Jimo district of Qingdao, about 90 kilometres from the city centre. The yard traces its origins to 1949 an

    SHIPBUILDING:

    • RO-RO Vessels

    • Bulk Carriers

    • Container Vessels

    • Ferries

    • PSV Vessels

    TOTAL DOCKS • 2

    1

    Graving Dock

    480

    76

    14

    m

    2

    Graving Dock

    180

    28

    13

    m

    TOTAL WHARF LENGTH • 1090 m

    1

    Wharf 1

    1090 M

  • Cochin Shipyard Limited logo

    India

    Cochin Shipyard Limited builds and repairs ships at Perumanoor in Kochi, Kerala. It was incorporated in 1972 as a wholly owned Government of India company, sits under the Ministry

    SHIPBUILDING:

    • RO-RO Vessels

    • Crude Oil Tankers

    • Bulk Carriers

    • Container Vessels

    • Ferries

    • Tugboats

    • PSV Vessels

    • Construction Vessels

    TOTAL DOCKS • 2

    1

    Graving Dock

    255

    43

    9

    m

    2

    Graving Dock

    310

    75

    13

    m

    TOTAL WHARF LENGTH • 1128 m

  • Colombo Dockyard PLC logo

    Sri Lanka

    Colombo Dockyard PLC is a ship repair, shipbuilding, heavy engineering and offshore engineering yard inside the Port of Colombo. It was established in 1974 and marked its fiftieth

    SHIPBUILDING:

    • RO-RO Vessels

    • Bulk Carriers

    • Ferries

    • Tugboats

    • Cable Layer Vessels

    • Multi-purpose Vessel

    TOTAL DOCKS • 2

    1

    Graving Dock

    107

    24

    6.7

    m

    2

    Graving Dock

    62

    26

    9.7

    m

    TOTAL WHARF LENGTH • 1000 m

    1

    Wharf 1

    1000 M

  • Poland

    CRIST S.A. is a shipyard at Gdynia in Poland, working in shipbuilding, offshore construction, steel structures and marine and civil engineering. The site covers 28 hectares. The fo

    SHIPBUILDING:

    • RO-RO Vessels

    • Barge

    • Ferries

    • Rigs & Platforms

    TOTAL DOCKS • 1

    1

    Graving Dock

    379

    70

    8

    m

    TOTAL WHARF LENGTH • 450 m

    1

    Wharf 1

    450 M

  • China

    Fujian Southeast Shipbuilding Co., Ltd. builds ships in the Mawei Economic and Technological Development Zone at Fuzhou, inside the free trade zone pilot area. It was formed in 195

    SHIPBUILDING:

    • RO-RO Vessels

    • Crude Oil Tankers

    • Product Tankers

    • Chemical Tankers

    • Container Vessels

    • Salvage Vessels

    • AHTS Vessels

    • PSV Vessels

    • Construction Vessels

    • Diving Support Vessels

      (+1)

    TOTAL WHARF LENGTH • 700 m

    1

    Wharf 1

    700 M

Find

Records Marine is operated by RECORDS MARINE — FZCO (Dubai, UAE), Trade Licence No. 60836. The platform IP is owned by RECORDS MARINE IP HOLDINGS LTD (ADGM, No. 27123).

© 2026 Records Marine. All rights reserved