A gas carrier is the one vessel type a repair yard cannot improvise for. Before the ship touches the blocks, its cargo system has been warmed, gas-freed, and inerted on a schedule agreed weeks ahead; once it is in dock, every job around the cargo plant demands people who know what a cryogenic system forgives and what it does not. The LNG and LPG workshop is the yard's claim to that competence, and a gas carrier repair yard is selected on the substance behind the claim.
Before the Dock: The Gas-Free Interface
The docking of gas tonnage begins with atmosphere management, and the yard is a participant, not a spectator. Warming up, liquid freeing, inerting, and aerating the cargo system take days and consume nitrogen in volumes only a prepared facility supplies; the certificates that declare tanks safe for entry and hot work set the legal ground for everything that follows. A yard experienced with gas carriers quotes this phase with dates and nitrogen capacity in the text - and a yard that leaves it out of the quotation entirely has answered the selection question early.
Inside the Workshop: Valves, Pumps, Compressors
The workshop's bench work concentrates where cryogenic service punishes ordinary overhaul habits. Cargo valves come ashore for seat work and testing with materials and clearances chosen for service far below zero, and are proven tight at temperatures the test bench must be able to reach - a cryogenic valve passed at ambient is an assumption, not a result. Cargo and spray pumps, cargo compressors, and heat exchangers of the reliquefaction and vaporizer plant follow the same logic: maker-correct clearances, records against test figures, and assembly clean enough for oxygen-adjacent and low-temperature duty. Membrane and containment work stands apart - repairs inside the tanks of membrane ships run under the containment designer's own regime with certified contractors - and the yard's role is knowing that boundary and staging access for those who hold the certification.
Piping in the Cold
Cryogenic piping rewards a dedicated bench. Stainless spools for cargo and spray lines are fabricated with the cleanliness and weld quality low temperature demands, tested accordingly, and insulated in systems where a vapour leak becomes an ice diagnosis weeks later. Yards route this through their pipe fabrication capability, and on gas tonnage the pipe workshop is effectively an extension of the gas plant scope - worth assessing as one capability rather than two.
Docked Scope or Sailing Scope
Gas carrier repair splits naturally into what needs the dock and what does not, and much of the plant's maintenance never needs a dock at all. Instrumentation, custody transfer systems, compressor overhauls, and troubleshooting travel with the vessel through LNG and LPG systems services, between voyages and without the gas-freeing overhead. The docking earns the jobs that need an open, inerted, gas-free system and external access - which is exactly why the two scopes should be planned together: the same gas-free window that the dock requires is the cheapest access the plant's other work will ever get.
Selecting the Yard
- Gas carrier references, recent and typed - LNG and LPG are different plants; references should match the vessel's own type and containment.
- Nitrogen and atmosphere capacity stated - volumes and delivery rate for inerting and drying, in the quotation, with the schedule they support.
- Cryogenic test capability - valve and component testing at service-representative temperature, documented.
- Containment boundary declared - which tank-internal work the yard performs, which runs under certified specialist contractors, and how the yard stages both.
- Vetting-grade paperwork - gas carriers live under terminal and charterer scrutiny, and the docking file the yard produces should read accordingly.
Send the vessel type, containment system, cargo plant maker list, and the intended gas-free plan with the inquiry. Dock dimensions, wharf length, location, and verification narrow the yards below - and an LNG and LPG workshop that responds with nitrogen figures and typed references has been through this before, which is the entire point.
SHIP REPAIR:
LNG & LPG Workshop
Air Condition & Refrigeration Services
Alignment & Jack Up Services
Assembling Workshop
Assembly Area
Balancing Workshop
Coating Services
Conversion & Retrofit Services
Deck and Hull Workshop
Design & Engineering Services
(19)
TOTAL DOCKS • 3
1Floating Dock
300
52
6
m
2Floating Dock
228
36
6.5
m
3Floating Dock
290
46
9
m
TOTAL WHARF LENGTH • 1500 m
1Wharf 1
1500 M
SHIP REPAIR:
LNG & LPG Workshop
High Pressure Pumps Workshop
Governor Workshop
Air Condition & Refrigeration Services
Assembling Workshop
Alignment & Jack Up Services
Assembly Area
Balancing Workshop
Coating Services
Conversion & Retrofit Services
(17)
TOTAL WHARF LENGTH • 3000 m
1Wharf 1
3000 M
SHIP REPAIR:
LNG & LPG Workshop
Conversion & Retrofit Services
Design & Engineering Services
Electrical Workshop
Engines & Machinery Services
General Cleaning Services
Governor Workshop
High Pressure Pumps Workshop
Hydraulic Workshop
Laser Cladding Services
(16)
TOTAL DOCKS • 4
1Graving Dock
385
80
14
m
2Graving Dock
270
46
12
m
3Graving Dock
350
80
14
m
4Shiplift
188
33.8
8
m
TOTAL WHARF LENGTH • 1889 m
1Wharf 1
1889 M
SHIP REPAIR:
LNG & LPG Workshop
Air Condition & Refrigeration Services
Alignment & Jack Up Services
Balancing Workshop
Coating Services
Conversion & Retrofit Services
Design & Engineering Services
Disposal Services
Electrical Workshop
Engines & Machinery Services
(16)
TOTAL DOCKS • 3
1Floating Dock
252
43
7
m
2Floating Dock
230
36
6.8
m
3Floating Dock
184
27
6.5
m
TOTAL WHARF LENGTH • 1900 m
1Wharf 1
500 M
2Wharf 2
500 M
3Wharf 3
450 M
4Wharf 4
450 M
SHIP REPAIR:
LNG & LPG Workshop
Air Condition & Refrigeration Services
Alignment & Jack Up Services
Balancing Workshop
Coating Services
Conversion & Retrofit Services
Design & Engineering Services
Disposal Services
Electrical Workshop
Engines & Machinery Services
(16)
TOTAL DOCKS • 1
1Floating Dock
350
65
6
m
TOTAL WHARF LENGTH • 1000 m
1Wharf 1
350 M
2Wharf 2
350 M
3Wharf 3
300 M
SHIP REPAIR:
LNG & LPG Workshop
Alignment & Jack Up Services
Air Condition & Refrigeration Services
Balancing Workshop
Coating Services
Conversion & Retrofit Services
Design & Engineering Services
Disposal Services
Electrical Workshop
Engines & Machinery Services
(13)
TOTAL DOCKS • 4
1Graving Dock
302
45
13.5
m
2Graving Dock
580
109
14.5
m
3Graving Dock
360
68
9
m
4Graving Dock
560
40
9
m
TOTAL WHARF LENGTH • 2848 m
1Wharf 1
2848 M
SHIP REPAIR:
LNG & LPG Workshop
Air Condition & Refrigeration Services
Alignment & Jack Up Services
Balancing Workshop
Coating Services
Conversion & Retrofit Services
Design & Engineering Services
Disposal Services
Electrical Workshop
Engines & Machinery Services
(16)
TOTAL DOCKS • 5
1Graving Dock
355
78
14
m
2Graving Dock
325
54
13
m
3Slipway
300
30
9
m
4Slipway
350
40
9
m
5Slipway
300
20
9
m
TOTAL WHARF LENGTH • 3000 m
1Wharf 1
3000 M
SHIP REPAIR:
LNG & LPG Workshop
Air Condition & Refrigeration Services
Alignment & Jack Up Services
Balancing Workshop
Coating Services
Conversion & Retrofit Services
Design & Engineering Services
Disposal Services
Electrical Workshop
Engines & Machinery Services
(12)
TOTAL DOCKS • 2
1Graving Dock
400
83
15
m
2Graving Dock
360
67
15
m
TOTAL WHARF LENGTH • 3000 m
1Wharf 1
3000 M