SIRE 2.0 Inspection: What Changed and How Tanker Operators Prepare

For more than 30 years, the SIRE inspection has been one of the main tools oil majors use to decide whether a tanker is fit to charter. In September 2024, the programme changed in a fundamental way. SIRE 2.0 replaced the fixed questionnaire with a tailored set of questions for every inspection, and it added a structured assessment of how the crew actually works.
For tanker operators, preparation can no longer focus on a known list of questions.
What Is SIRE, and Why Did It Change?
SIRE, the Ship Inspection Report Programme, is run by the Oil Companies International Marine Forum (OCIMF) and was launched in 1993 to give oil companies and charterers a shared database of tanker inspection reports. Submitting companies, which are OCIMF members, commission the inspections. OCIMF-accredited inspectors carry them out, and the reports go to programme users who assess vessels before chartering them.
The original programme used a standard questionnaire, the VIQ, with the same questions for every ship. Over time, crews became familiar with the question set, and reports were often judged by the number of observations rather than the risks behind them. SIRE 2.0 was developed to address this. It became the only SIRE inspection format on 2 September 2024, when the option to request a VIQ7 inspection was withdrawn.
SIRE 2.0 vs VIQ7: What Changed
The table below compares the two systems.
Swipe horizontally to view all columns
Area | Original SIRE (VIQ7) | SIRE 2.0 |
|---|---|---|
Questionnaire | Same questions for every ship | A bespoke questionnaire for each inspection |
Question selection | Fixed list | Selected by an algorithm based on ship type, equipment, and history |
Assessment | Mostly yes/no answers | Separate responses for hardware, processes, and human factors |
Human element | Limited attention | Structured assessment of crew performance |
Pre-inspection data | Vessel particulars questionnaire | Particulars, pre-inspection questionnaire, photographs, and certificates |
Recording | Paper-based or offline tools | Real-time recording on intrinsically safe tablets |
Evidence | Mostly free text | Observations supported by documents and photographs, where permitted |
How Is the Questionnaire Built?
Every SIRE 2.0 inspection uses a Compiled Vessel Inspection Questionnaire (CVIQ). The system selects questions from the SIRE 2.0 Question Library according to the ship's type, its equipment, and the data supplied by the operator. Each inspection gets its own set of questions.
Questions in the library are ranked by risk and fall into two main groups:
- Core questions appear in every inspection. They cover risks that could lead to catastrophic or severe outcomes, so operators know these areas will always be checked.
- Rotational questions are spread across several inspections of the same ship. The order is not predictable, so the crew cannot know in advance which of these questions will be asked.
OCIMF can add campaign questions too. These are existing rotational questions assigned to every inspection for a fixed period, in response to an accident or an industry trend.
The consequence is simple. Any question from the library may appear, so the ship needs to be ready in every area at all times.
How Are Hardware, Processes, and Human Factors Assessed?
The biggest change is that inspectors now look at each question from three angles.
Swipe horizontally to view all columns
Element | What the inspector checks | Example |
|---|---|---|
Hardware | Whether equipment is in good condition and works as intended | A gas detector is calibrated and working. |
Process | Whether company procedures exist, are suitable, and are followed | A procedure for gas testing exists and matches how the work is done. |
Human | Whether the crew can carry out the task competently and understands its risks | The officer can demonstrate the gas test and explain why each step matters. |
The human element is new for most crews. Inspectors watch tasks and talk to crew members to understand how work is done in practice. Where performance falls short, the inspector records the factors that may explain it, such as workload, familiarity with procedures, or how well the crew recognises that a task is safety critical.
One issue can produce several observations. A faulty piece of equipment that has not been reported, for example, may lead to a hardware observation, a process observation on defect reporting, and a human observation on awareness. SIRE 2.0 also allows inspectors to record positive observations where the crew performs above the expected standard.
From Inspection Request to Published Report
The inspection process has eight main steps, split between the office before the visit and the ship during and after it.
Before the inspector boards
- Request. The operator requests an inspection in the SIRE system.
- Acceptance. A submitting company accepts the request and appoints an accredited inspector.
- Pre-inspection data. The operator completes the Harmonised Vessel Particulars Questionnaire (HVPQ), the Pre-Inspection Questionnaire (PIQ), a standard set of photographs, and the ship's certificates, then declares the data complete.
- Questionnaire. The system compiles the CVIQ and releases it to the inspector.
On board and after the visit
- Inspection. The visit usually takes about one working day, and the inspector records responses on a tablet as the inspection goes.
- Report review. The submitting company reviews the draft report.
- Operator comments. The operator adds comments to the negative observations.
- Publication. The operator publishes the report, or it is published automatically after 14 days.
Treat the pre-inspection data with care. The operator declares that the information and photographs are accurate and up to date, and the inspector checks them on board. If a photograph does not match the real condition of the ship, this can itself lead to a negative observation.
First Results: Fewer Negative Observations
INTERTANKO's SIRE 2.0 benchmarking report for 2025, based on 7,241 inspections, shows that the average number of negative observations per inspection fell from 6.33 in late 2024 to 5.24 across 2025. Negative observations on core questions were reported to have fallen by around 35 to 40 percent during the year. The trend continued in the first half of 2026: compared with the same period of 2025, all tanker sectors recorded fewer negative observations and more positive ones.
The same 2025 data shows where the problems lie. Human factors accounted for 37 percent of all negative observations. Among the factors that explain human performance, custom and practice that drifts away from written procedures was the most common, at 32.9 percent. In both cases, the root cause lies in how the work is done, not in the equipment.
Feedback on the programme has been broadly positive. In OCIMF's 2024/25 user survey, about two thirds of vessel operators rated the quality of SIRE 2.0 as high or very high. Operators have also reported that inconsistent interpretations between inspectors still create uncertainty.
How Do Tanker Operators Prepare?
Preparation for SIRE 2.0 is continuous work shared between the office and the ship.
Swipe horizontally to view all columns
Area | What operators do |
|---|---|
Pre-inspection data | Keep the HVPQ, PIQ, photographs, and certificates accurate and current. |
Procedures | Carry out a gap analysis between company procedures and the SIRE 2.0 Question Library. |
Risk assessments | Confirm that tasks covered by the questions have documented risk assessments. |
Internal inspections | Align superintendent checklists with SIRE 2.0, so internal audits cover hardware, process, and human elements. |
Defect reporting | Encourage crews to report defects openly. Hidden defects lead to observations on both hardware and process. |
Crew training | Train crews to explain why procedures exist and which steps are safety-critical, not only how to perform them. |
Follow-up | Track observations across the fleet, and close the actions recorded in the operator comments. |
Preparation must reflect daily practice. A ship that only prepares in the days before an inspection is likely to show gaps in the process and human elements, even if its equipment is in good condition.
Much of the hardware side, such as fire safety and life-saving appliances, is also checked by port State control officers. A PSC inspection checklist organised by inspection area helps the crew keep those systems ready for both.
Close the Gaps Before the Inspector Arrives
Because any question in the library can appear, the most reliable way to find gaps is to look at the ship the way a SIRE 2.0 inspector would. An independent pre-SIRE inspection service provider does exactly that. It checks hardware, procedures, and crew performance against the Question Library, and gives the operator time to correct findings before the official inspection takes place.